Stihl distribution center
Dieburg, DE
The main location of the globally active enterprise in Dieburg, nearby Frankfurt Airport, is undergoing expansion measures while remaining fully operational. The project is based on the availability of land and also calls for the demolition of existing buildings as well as the construction of temporary building elements.
The main task involves the creation of a functional building that is suitable for training and representation purposes. It is divided into two two-floor sections, which are connected by a representative hall, which also serves as an exhibition area. In addition to testing and training rooms, the building also contains offices as well as a canteen.
Client
Stihl Vertriebszentrale AG & Co.KG
Size
17,834 m2
Status
Design study